KEE BioDisc Panel Replacement – Crawford, South Lanarkshire
KEE BioDisc panel replacement Crawford — We were called to a KEE BioDisc with a corroded control panel and clear water ingress. We replaced the panel, checked the wiring, tested alarms, and returned the plant to safe, reliable operation.


✅ What our panel replacement includes
- Isolation & safety: Lock-off, verify dead, safe working area.
- Panel swap: Remove corroded enclosure; install sealed, compliant replacement.
- Electrical checks: Terminations tightened; insulation/continuity tests; overload/contactor function.
- Control logic: Rotation checks, duty/assist/alternation confirmation, alarm verification.
- Final proving: Record load currents, run times, and alarm response.
Water ingress and corrosion are the most common causes of panel failure. Replacing early prevents bigger electrical faults and downtime.
🛑 Why servicing matters
Routine inspections catch panel degradation, loose terminations, failing contactors and moisture issues before they become full failures. Servicing avoids emergency callouts and keeps effluent treatment compliant.
📅 Annual service contracts
We offer annual service contracts covering electrical checks, mechanical inspections and scheduled maintenance across Crawford, South Lanarkshire and throughout Scotland.
Prefer a one-off repair? We’ll diagnose, replace and test on the same visit wherever possible.
Looking for sewage treatment plant servicing or sewage pump repairs? We handle those too.
📞 Book a KEE BioDisc Panel Replacement