BioTec P12 Service – Dolphinton, South Lanarkshire

BioTec P12 Service – Dolphinton, South Lanarkshire

BioTec P12 service Dolphinton carried out today for an existing customer as part of their annual maintenance contract. The plant is a Kingspan/Klargester BioTec P12 with an EL-60 air blower, green Darcy Kingspan control panel and gravity outlet. Regular servicing ensures continued compliance with SEPA discharge standards and extends system life.

Kingspan BioTec P12 service Dolphinton – routine sewage treatment inspection
Kingspan BioTec P12 sewage treatment plant serviced in Dolphinton, South Lanarkshire.

✅ Service tasks completed

  • Darcy Kingspan control panel: All indicators, alarms, and circuits tested. Loss-of-power and loss-of-pressure alarms proved operational.
  • EL-60 blower: Checked and running within spec. Air filter replaced to maintain flow and efficiency.
  • Electrical readings: 0.32 A at 252 V – steady and efficient operation confirmed.
  • Beacon cable repair: Cable severed during grass cutting; new section installed, joint sealed, and operation verified.
  • Tank assessment: Sludge and crust readings low – no emptying required this year, saving unnecessary tankering cost.

The plant was left operating quietly and efficiently with stable air pressure, correct electrical loading, and balanced treatment conditions.

Enkamat clean during BioTec P12 service Dolphinton
Enkamat filter cleaned to maintain healthy aeration and even biological flow.

🔬 System observations

All air delivery lines were clear, with even distribution across chambers. The Darcy panel and beacon now provide full fault indication following cable repair. The Enkamat filter was cleaned, and the spray cone unblocked to restore proper aeration. Routine airflow maintenance prevents blower strain and ensures balanced biological treatment.

Spray cone unblocked during BioTec P12 service Dolphinton
Spray cone cleared to restore even aeration and proper system circulation.

🛠 Why BioTec servicing is essential

Routine servicing keeps the blower clean, the control panel responsive, and ensures early detection of faults like damaged cabling or restricted airflow. Without it, air supply drops, bacteria die back, and treatment efficiency falls—risking odours and compliance issues.

📅 Service contracts available

We offer annual BioTec service contracts across Dolphinton, West Linton and Biggar. Each visit includes blower and panel inspection, electrical testing, sludge measurement, and clear guidance on when desludging is required.

Learn more on our sewage treatment plant servicing page or visit SEPA for discharge guidance.

📞 Book a BioTec Service in Dolphinton