We were recently called back to a property in Minishant after previously attending a complete pump station failure last year. At that time, the customer had a two-pump setup — but only one physical pump was on-site, and that pump had failed, leaving the chamber non-functional. We were asked to supply and fit a like-for-like replacement KSB Ama-Porter 501SE pump to restore temporary operation while planning a full system upgrade.

Today, we returned to complete the job properly.

Upgrade Overview

  • Installed a new dual-pump control panel with overload protection and proper failsafes
  • Fitted a new KSB Ama-Porter 501SE pump with pipework
  • Installed 4x float switches (start, stop, assist/duty, and high-level alarm)
  • Mounted all floats on a fixed bracket within the chamber
  • Wired up a new rotary isolator for safe power management
  • Thorough testing confirmed full operation of pump, alarms, and switching

The customer has also agreed to grind a cable duct channel into the concrete at a later date to permanently bury the surface cable run — improving safety and aesthetics.

Ongoing Support

This customer is now under a yearly service contract with Caledonia Environmental, ensuring their system continues to run efficiently and any issues are caught early.